We start with an honest assessment of your home’s hot water needs, existing gas or electrical setup, and the best location for your new unit. No overselling, no pushing equipment you don’t need.
Next, we handle all the permits and ensure your installation meets local codes. This includes proper venting for gas units, electrical upgrades if needed, and connecting everything safely to your existing plumbing system.
The actual installation typically takes 4-8 hours depending on your home’s setup. We test everything thoroughly, walk you through the new system’s operation, and clean up completely before we leave. You’ll have hot water flowing that same day.